Saturday, 1 October 2011

The Dublin Port Tunnel

The Dublin Port Tunnel is a road traffic tunnel in Dublin, Ireland, that forms part of the M50 motorway.

The twin tunnels form a two-lane dual carriageway connecting Dublin Port, which lies to the east of central Dublin, and the M1 motorway close to Dublin Airport. The tunnels are 4.5 km (2.8 miles) in length and total project length of 5.6 km (3.5 miles). It had final cost of approximately €752 million.

The tunnel was officially opened on 20 December 2006 by then Taoiseach Bertie Ahern; it was initially only open to HGVs.[1] It was opened to all traffic on 28 January 2007.
 Dublin Port Tunnel
 Dublin Port Tunnel
 Dublin Port Tunnel Construction
 Dublin Port Tunnel
 Dublin Port Tunnel Construction


No comments:

Post a Comment